Dormer and bathroom, Croydon

Dormer and bathroom, Croydon Project duration – 6 weeks Harringtons Group built a dormer into a first floor pitched roof to create space for incorporating an upstairs bathroom. The bathroom included the installation of a bath, walk in shower, toilet and wash hand basin. The pitch of the roof created an awkward space which was…

Orangery, East Grinstead

Orangery, East Grinstead Project duration – 12 weeks Harringtons Group added a rear extension to this recent new build property to provide much-needed additional space for the customer. We worked closely with the customer, holding detailed discussions to determine their requirements and ensure that we could bring their vision for the property to life. As…

Front refurbishment, Tooting Bec

Front refurbishment, Tooting Bec Project duration – 6 weeks Harringtons Group spent six weeks overhauling the front of this Tooting Bec property to bring it in line with the customer’s vision for their home. We worked closely with the customer, discussing their refurbishment plans in detail so that we could ensure that the final result…

Loft conversion, Shirley

Loft conversion, Shirley Project duration – 15 weeks Harringtons Group completed this impressive and technically challenging loft conversion in 15 weeks, working from and adapting plans provided by the customer’s architect and structural engineer. By working closely with the customer throughout the process, we were able to overcome a number of technical challenges, from reconfiguring…

Extension, South Godstone

Extension, South Godstone Project duration – 16 weeks Working to plans supplied by the customer’s architect and structural engineer, Harringtons Group completed this eye-catching rear extension within 16 weeks. We transformed the dated property into a stunning, modern home, taking care to incorporate as much natural light as possible, per the customer’s specifications. This was…

Extension, East Grinstead

Extension, East Grinstead Project duration – 17 weeks Harringtons Group transformed this previously unmaintained property in just 17 weeks, achieving a fantastic result that exceeded the customer’s expectations. We joined the project after the customer realised that their budget couldn’t accommodate the plans that their architect had drawn up; instead of allowing the project to…

Full bungalow refurbishment, East Grinstead

Full bungalow refurbishment, East Grinstead Project duration – 22 weeks Over the course of 22 weeks, Harringtons Group transformed this dated bungalow, substantially expanding the property and overhauling its interior. Working from plans and structural drawings provided by the customer’s architect, this project posed a number of technical challenges, including the relocation of water, gas,…